SMART TECHNOLOGY · CONNECTED MINING
014 008 5328Client portal ↗
MineNet Africa — Smart Technology, Connected MiningLet’s connect

SOLUTION / MACHINE PERFORMANCE & INDUSTRIAL IOT

Machine performance & industrial IoT

Build an asset hierarchy, identify credible failure modes and instrument the measurements that inform maintenance or operating decisions. Assess efficiency against useful output and comparable duty.

Vibration sensor and secured cabling on an underground dewatering pump
AI-generated illustration · conceptual mining scene, not a MineNet installation

SOLUTION SCOPE

What we bring into view.

01

Condition monitoring

Trend vibration, temperature, current and load against the asset’s failure mechanisms.

02

Operating performance

Connect running state, cycles, tonnes, flow or pressure to defined delay and loss categories.

03

Energy intensity

Assess pump kWh/m³, conveyor kWh/t or unloaded compressor running with the necessary duty context.

04

Maintenance integration

Route validated exceptions to inspection, confirmed defects, planned interventions and verified closure.

PRODUCTS & INTEGRATION

The system behind
the solution.

Industrial sensors, meters, suitable gateways, machine interfaces and supported maintenance-system integration. Select measurement methods and communications against the actual asset.

Reporting outputs

  • Asset condition and duty trends
  • Availability and delay summaries
  • Comparable-duty energy measures
  • Inspection requests and closure evidence

DESIGN SCENARIO · ILLUSTRATIVE

How the decision works.

Rising pump energy per cubic metre triggers a flow, head and instrumentation check. The investigation considers wear, blockage and operating pattern before attributing the change to efficiency.


What the pilot must demonstrate

Instrument agreement, data completeness, confirmed defects and baseline-relative operating outcomes.

LET’S CONNECT

Start with one operating challenge.

Tell us about your mine, work area or equipment system. We will discuss the scope, evidence and next steps for an assessment.

Discuss your requirements